Beijing Daxing International Airport

Location: Beijing, China 1. Project Scale Total airport area: 1.4 million m² Micoe solar collector area: 13152 m² People served: nearly 20000 airport staff 2. Background & Scale Beijing Daxing International...

Share
Beijing Daxing International Airport

Location: Beijing, China

1. Project Scale

Total airport area: 1.4 million m²

Micoe solar collector area: 13152 m²

People served: nearly 20000 airport staff

2. Background & Scale

Beijing Daxing International Airport, one of the “New Seven Wonders of the World,” has a total investment of RMB 450 billion. Micoe participated in 12 clean energy hot water projects at the airport, delivering low-carbon hot water solutions.

3. Products & Core Components

U-type solar collectors — 78034 vacuum tubes

Flat plate solar collectors — 602 units, German-imported, laser welded

Piping & insulation — 304 stainless steel + Class B1 rubber-plastic + aluminum cladding

Pump system — German components, low noise, low vibration

Control system — proprietary, developed by Micoe

4. Key Challenges Solved

High hot water demand — Separated collector design improved efficiency for 20000 people and over 1000 tons daily.

Rooftop runway — U-type collectors were adopted with no site impact.

Complex construction — Over 1000 workers across 12 engineering types, with integrated R&D and supply chain.

Noise control — German pumps ensured minimal vibration.

Durability — 304 stainless steel with aluminum-clad insulation.

Coordination — A proprietary control system ensured unified operation and safety.

5. Construction Scale

Over 1000 construction workers were deployed across 12 engineering categories, making this the most complex cross-discipline construction in the history of clean energy.

6. Innovation Breakthrough

To accommodate the airport's rooftop runway, Micoe adopted a U-type solar collector solution, ensuring no impact on site use while maintaining efficient energy collection and conversion.

7. Energy Saving & Environmental Benefits

With a total collector area of 13152 m², the project annually delivers:

Electricity saved: 9.63 million kWh

CO₂ emission reduction: 4872 tons

Equivalent to planting: 40000 trees

8. Project Significance

A national landmark for China's 70th anniversary

World-leading operational efficiency and green metrics

Confirms Micoe's comprehensive capabilities in R&D, supply chain management, and complex construction coordination for mega-scale projects

A milestone for Micoe in the clean energy sector

9. Client Feedback

“The Micoe team showed exceptional professionalism and technical strength throughout the project. Despite complex conditions and strict requirements, they delivered on time and provided innovative solutions. The project’s energy-saving and environmental benefits far exceeded our expectations.”

— Project Lead, Beijing Daxing International Airport