×

Get in touch

Commercial ESS

Home >  Products >  PV&ESS >  Commercial ESS

Intelligent air cooled energy storage cabinet ME86A-20K 215kWh/233kWh energy storage cabinet 3a72kWh/418kWh energy storage cabinet Lightweight industrial and commercial energy storage | speed switch | full scene adaptive

Features:

●1.High safety

Safety management on DC circuit;rapid fuse protection and arc protection

Multiplex battery protection system that guarantees safety

Intelligent leakage detection and refrigerant refilling system that improves overall safety

●2.High integration

High integration;easy for transportation and maintenance

Pre-assembled battery units enable easy site construction

System ready-for-use within 8h site construction

●3.Long service life

Smart cooling system ensures higher efficiency and longer battery service life

Modular design that facilitates capacity expansion

●4.Smart functions

Real-time status monitoring and fault recording that realizes fault alarming and positioning

Monitoring and recording of battery performance

Description:

This series is equipped with liquid cooling temperature control + intelligent PCS integrated energy storage cabinet, using military-grade design:

Ultra-wide voltage adaptation: the DC side voltage covers 648V~1497V, which can directly match the photovoltaic string and wind power converter

Intelligent power management: Built-in IEC62477 certified PCS, support reactive power compensation, harmonic suppression functions

Minimalist deployment: Prefabricated cabin structure, on-site only cable connection, commissioning cycle is reduced by 70%

MOQ:one (machine)

Model    MCI-215L-100K  MCI-233L-125K MCI-372L-186K  MCI-418L-215K
Rated power 100kW 125kW 186kW 215kW
Celltype    LFP 3.2V/280Ah LFP3.2V/314Ah
Battery pack configuration   1P240S  1P60S 1P416S
Total energy @BOL 215kWh@25℃,0.5P  233kWh@25℃,0.5P 372kWh@25℃,0.5P 418kWh @25℃,0.5P
Voltage range at DC side 648~864V 702~936V 1123.2~1497.6V
Voltage range at AC side 400V(-15%~10%) 400V(-15%~10%)
Rated grid frequency  50/60Hz±2.5Hz
AC rated current 151A 181A 282A 326A
Maximum PCS power conversion efficiency 98.50%
Way of connection to grid 3W/N+PE
Max.operating temperature -30~55℃ -40~55℃
Maximum efficiency >88%
Weight* approx2400kg approx2600kg approx.3600kg approx.3700kg
Thermal control Liquid-cooling
Fire protection system  Aerosol/Perfluoro(Optional)
Display touch screen(optional)
IP Class IP54(Pack:IP67)
Anti-corrosion class C4
Humidity 0~95%(Non-condensing)
Dimension(L*W*H)* 1000*1350*2300mm 1400*1400*2400mm
Maximum operating altitude 2000m
Communication Ethernet/CAN/RS485
Communication protocol  MODBUS-RTU
Certificates GB/T34120,GB/T 36276,IEC62477,IEC62619,IEC63056

Power optimization in heavy industry Steel/electrolytic aluminum plant: With more than 315kVA transformers to achieve demand management, avoid excessive capacity electricityAutomotive manufacturing base: Buffer welding robot instantaneous high power impact, reduce transformer expansion pressure
New energy power hub DC side energy storage of photovoltaic power station: suitable for 1000V+ high voltage system, reducing DC/AC conversion lossWind farm black start power supply: provide 215kW/400V emergency power supply capacity
grid-level frequency modulation service 2-hour FM unit: SE418L-215K cabinet unit can provide 860kW/2h FM capacityFast response to AGC instructions: 98.5% conversion efficiency ensures second-level power response
Special polar scenes Arctic research station power supply: -40℃ ultra-low temperature start, IP67 protection against snowstormsDesert oil field energy storage: 55℃ high temperature continuous operation, C4 anti-corrosion response to salt spray erosion

Q1: How to ensure the safety of 1000V HVDC system?

A: Triple protection design:

A fast fuse is configured on the DC side to cut off the short circuit within 15ms

Positive and negative double insulation monitoring, leakage current > 30mA automatic power off

The grounding resistance of the cabinet is less than 0.1Ω and passes the IEC63056 voltage test

Q2: Is the energy consumption of the liquid cooling system too high?

A: Adopt variable frequency pump + zone temperature control strategy:

Standby power consumption < 200W, full load power consumption < 1.2kW

Compared with the traditional scheme, energy saving 40%, comprehensive energy efficiency > 88%

Q3: What is the effect of 2000 m high altitude on heat dissipation?

A: Performance is ensured through three optimizations:

The liquid cooling pipe pressure is increased to 1.5 times the standard value

The radiator area is increased by 20% to compensate for the decrease in air density

The fan speed is adjusted intelligently to maintain the heat transfer efficiency

Q4: How to achieve rapid expansion?

A: Support "stacking between cabinets" technology:

Four SE418L-215Ks can be connected in parallel up to 860kW/1.672MWh

Parallel circulation < 1%, no additional balancing controller required

Q5: What operations are required for routine maintenance?

A: Intelligent maintenance-free design:

The internal resistance detection is performed automatically every 6 months, and the abnormal cell is marked automatically

The liquid cooling pipe is equipped with self-cleaning function, and the coolant is not replaced for 5 years

The fire prevention system self-checks every month, and the results are sent to the operation and maintenance platform

Online Inquiry

If you have any suggestions, please contact us

Contact Us